• Aluminum Beam Multi-Punching Machine for Blinds Insulating Glass Production
  • Aluminum Beam Multi-Punching Machine for Blinds Insulating Glass Production
  • Aluminum Beam Multi-Punching Machine for Blinds Insulating Glass Production
  • Aluminum Beam Multi-Punching Machine for Blinds Insulating Glass Production

Aluminum Beam Multi-Punching Machine for Blinds Insulating Glass Production

Type: Insulating Glass Production Line
Certification: CE, UL
Structure: Vertical
Control System: Pneumatic
Condition: New
Punching Head: 5 Heads
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Transport Package
Seaworthy Package
Trademark
DETEK
Origin
China
HS Code
8464901900
Production Capacity
300sets/Year

Product Description

Insulating glass machine for blinds IGu production aluminum beam frame slots punching.

Application

Used for upper aluminum beam slots punching, hydraulic drive force, pneumatic clamping, high efficient, measure meter.
Aluminum Beam Multi-Punching Machine for Blinds Insulating Glass Production
Aluminum Beam Multi-Punching Machine for Blinds Insulating Glass Production

Parameter
Power 2.2KW 380V 50HZ
Working pressure 16MPA
Air supply 0.5Mpa
Dimension 2000×900×1450mm

Aluminum Beam Multi-Punching Machine for Blinds Insulating Glass Production
Aluminum Beam Multi-Punching Machine for Blinds Insulating Glass Production
Aluminum Beam Multi-Punching Machine for Blinds Insulating Glass Production

Aluminum Beam Multi-Punching Machine for Blinds Insulating Glass Production
Mostly asked questions below:

1. What is your soonest lead time?
  A: 60 days for whole production line, 30 days for single machine.  Special requirement pls check with sales.

2. How do you arrange the shipment?
  A: all machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.

3. Guarantee ?
  A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.

4. How we can install the machines?
  A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.

5. How about the after service?
  A: Spare parts within 72 hours.
     Experienced technical sales sort out most of your questions.
    Tens of service engineers ready for on-site service and instruction.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now