Certification:
Application
The secondary sealant sealing in Insulating Glass Units, ASR2800 is highly automatic silicone or polysulfide sealant sealing robot. Auto sealing robot guarantees the high quality of IGU for glass processing companies.
Feature
- Two separate dosing system, one key switch system. (Option)
- Automatic corner wiper (option).
- Economical and practical, used for glass deep processing company.
- Fully intelligent and friendly touching screen adopt Ethernet communication, with memory function and easy operation.
- High sealing performance, high automation, reduce labor cost, improve production efficiency.
- Best sealing quality without air bubbles, smooth surface, save time for corner correction.
- Equipped with anti-blocking device in the mixer, easy to clean.
- Servo control system adopts world famous brand (Japan YASKAWA), performance is stable, and counting speed is fast, sealant output with high precision, surface with high smoothness.
- Special V type transmission belt to avoid sealant sticking on the belt, ensure the glass edge clean, V type block is changeable.
- Suitable for triple IGu, stepped IGu and shaped IGu(Option)
- All parts with high standard ensure the stable performance.
- Equipped with high speed positioning function, glass can be located accurately when conveyor fast.
- Keep machine service and upgraded timely with our own R&D department.
Parameter
Max. IGu size |
2500×4000mm |
Min. IGu size |
180×300mm |
IGu thickness |
12-56mm |
Power supply |
3P 380V 50HZ 13KW |
Air pressure |
0.6-0.8Mpa |
Max. squeeze pressure |
32Mpa |
Sealing speed |
5-40m/min |
Dimension |
8900×1500×3400mm |
Brand parts list
Name |
Brand |
Country |
PLC |
Yaskawa |
Japan |
Servo driver |
Yaskawa |
Japan |
Servo motor |
Yaskawa |
Japan |
Touching screen |
WEINVIEW |
Taiwan |
Inveter |
TECO |
Taiwan |
Breaker |
Schneider |
French |
Contactor |
Schneider |
French |
Relay |
Schneider |
French |
Sensor |
AUTONICS |
S. Korea |
Proximity switch |
AUTONICS |
S. Korea |
Reduction motor |
YOUSHENG |
SHANGHAI |
Solenoid |
Airtag |
TAIWAN |
Air cylinder |
Airtag |
TAIWAN |
proportional valve |
SMC |
Japan |
Fine regulator |
SMC |
Japan |
Our workshop :
Packing&shipping
Our professional engineers available to oversea to ensure the after-sale service:
Cooperastion Brand:
Mostly asked questions below:
1. What is your soonest lead time?
A: 60 days for whole production line, 30 days for single machine. Special requirement pls check with sales.
2. How do you arrange the shipment?
A: All machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.
3. Guarantee ?
A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.
4. How we can install the machines?
A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.
5. How about the after service?
A: Spare parts within 72 hours.
Experienced technical sales sort out most of your questions.
Tens of service engineers ready for on-site service and instruction.