High Speed Double Glazed Glass Argon Gas Filling Machine

Product Details
Customization: Available
Certification: CE
Control System: PLC
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
4
Year of Establishment
2016-04-25
  • High Speed Double Glazed Glass Argon Gas Filling Machine
  • High Speed Double Glazed Glass Argon Gas Filling Machine
  • High Speed Double Glazed Glass Argon Gas Filling Machine
  • High Speed Double Glazed Glass Argon Gas Filling Machine
  • High Speed Double Glazed Glass Argon Gas Filling Machine
  • High Speed Double Glazed Glass Argon Gas Filling Machine
Find Similar Products

Basic Info.

Model NO.
ZCJ05
Max. Igu Filling Quantity
10PCS
Type
Insulating Glass Production Line
Structure
Vertical
Condition
New
Dimension
850*500*1310 mm
Transport Package
Seaworthy Package
Trademark
DETEK
Origin
China
HS Code
84649019
Production Capacity
500sets/Year

Product Description

Argon Gas filling machine for insulating glass production, with 95% argon gas filling percentage.
High Speed Double Glazed Glass Argon Gas Filling MachineHigh Speed Double Glazed Glass Argon Gas Filling Machine

Feature
  1. Gas filling option: Manual& Auto.
  2. Two control mode: oxygen sensor& time control
  3. High speed, 15~30L/min. max. 10pcs insulating glass.
  4. Easy operation with 5.7 inches touching screen.
  5. Filling process display. Alarm indicator for reminding.
  6. 4 portable wheel for movement.

Parameter
Power supply 1P 220V 50HZ 0.23kW
Max. IGu filling quantity  10 pcs
Compressed air supply 0.6MPa
Argon gas pressure ≥1MPa
Max. air volume 15~30L/min
Dimension 850×500×1310mm
Weight 75Kg

High Speed Double Glazed Glass Argon Gas Filling Machine
High Speed Double Glazed Glass Argon Gas Filling MachinePacking&Shipping:
High Speed Double Glazed Glass Argon Gas Filling MachineHigh Speed Double Glazed Glass Argon Gas Filling Machine

High Speed Double Glazed Glass Argon Gas Filling Machine

Mostly asked questions below:

1. What is your soonest lead time?
  A: 60 days for whole production line, 30 days for single machine.  Special requirement pls check with sales.

2. How do you arrange the shipment?
  A: All machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.

3. Guarantee ?
  A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.

4. How we can install the machines?
  A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and            food).
      The installation should be finished within 15 days, and will be charged 60USD/engineer/day.

5. How about the after service?
  A: Spare parts within 72 hours.
      Experienced technical sales sort out most of your questions.
      Tens of service engineers ready for on-site service and instruction.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier