BXL2000 vertical glass washing and drying machine takes the structure of vertical inclination. Used for single Low-E glass, or laminating glass washing and drying. The control box is located on the front door of the drying zone, which simplifies the operation.
Feature
- Automatic distinguish the coating side of Low-E glass, front 3 soft low-E brushes.
- Unique air knife and silencer for washing machine.
- The washing zone and water tank are made of stainless steel and corrosion-proof material. Water heating system available.
- The conveyor rollers are made of rubber, resistant to acid and alkali.
- Automatic adjustment of glass thickness from 3mm to 12mm.
- Drive speed adjusted by inverter stepless, the glass runs stably at proper speed.
- Three pairs of brushes, with high-pressure water spray nozzle.
- In the drying zone, there is a pair of alloyed and corrosion-proof air knife, installed angularly, generate strong air flow to dry both sides of glass.
- Three independent water circulating system: the first washing water system, the second washing water system and rinse water system.
- To ensure the washing quality, the water conductivity should not exceed 40µs/cm.
- 15KW blower with heating system.
Parameter
Max. glass size |
2000×2500mm |
Min. glass size |
280×480mm |
Single glass thickness |
3-12mm |
Glass washing speed |
3-10m/min |
Washing brushes |
3 pairs 0.11mm bristle |
Air supply |
0.8m3/min ≥0.8Mpa |
Water supply |
0.5t/h conductivity≤40μs/cm |
Power |
3P 380V 50HZ 19.2kw |
Dimension |
7800×2800×3087mm |
Mostly asked questions below:
1. What is your soonest lead time?
A: 60 days for whole production line, 30 days for single machine. Special requirement pls check with sales.
2. How do you arrange the shipment?
A: All machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.
3. Guarantee ?
A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.
4. How we can install the machines?
A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.
5. How about the after service?
A: Spare parts within 72 hours.
Experienced technical sales sort out most of your questions.
Tens of service engineers ready for on-site service and instruction.