Low-E Deleting Tool for Insulating Glass Production

Product Details
Customization: Available
Control System: Pneumatic
Pneumatic System: Air Supply Only
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
4
Year of Establishment
2016-04-25
  • Low-E Deleting Tool for Insulating Glass Production
  • Low-E Deleting Tool for Insulating Glass Production
  • Low-E Deleting Tool for Insulating Glass Production
  • Low-E Deleting Tool for Insulating Glass Production
  • Low-E Deleting Tool for Insulating Glass Production
  • Low-E Deleting Tool for Insulating Glass Production
Find Similar Products

Basic Info.

Model NO.
TCM01
Air Pressure
0.6-0.7MPa
Express
TNT/DHL/UPS/FedEx
Type
Glass Coating Machine
Structure
Vertical
Condition
New
Transport Package
Seaworthy Package
Specification
2KG
Trademark
DETEK
Origin
China
HS Code
8464901900
Production Capacity
2000sets/Year

Product Description

Low-E Deleting Tool for Insulating Glass Production

TCM-01 was used for deleting the low-E coating of glass with pneumatic motor. Safe speed limits, light weight, and stable performance

Technical parameter
Wheel diameter 60mm
Inside wheel diameter 6mm
Wheel thickness 10/12/15mm
Dimension 200*150*100mm
Working pressure 0.6-0.7Mpa
Weight 1.5KG

Low-E Deleting Tool for Insulating Glass Production
Low-E Deleting Tool for Insulating Glass Production
Low-E Deleting Tool for Insulating Glass Production
Low-E Deleting Tool for Insulating Glass Production
Mostly asked questions below:

1. What is your soonest lead time?
  A: 60 days for whole production line, 30 days for single machine.  Special requirement pls check with sales.

2. How do you arrange the shipment?
  A: all machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.

3. Guarantee ?
  A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.

4. How we can install the machines?
  A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.

5. How about the after service?
  A: Spare parts within 72 hours.
     Experienced technical sales sort out most of your questions.
    Tens of service engineers ready for on-site service and instruction.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier