Two Component Insulating Glass Secondary Sealant Spreading Machine

Product Details
Customization: Available
Certification: CE
Warranty: One Year
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
500000 RMB
Plant Area
5000 square meters
  • Two Component Insulating Glass Secondary Sealant Spreading Machine
  • Two Component Insulating Glass Secondary Sealant Spreading Machine
  • Two Component Insulating Glass Secondary Sealant Spreading Machine
  • Two Component Insulating Glass Secondary Sealant Spreading Machine
  • Two Component Insulating Glass Secondary Sealant Spreading Machine
  • Two Component Insulating Glass Secondary Sealant Spreading Machine
Find Similar Products

Basic Info.

Model NO.
ST02
Driving Force
Air Motor
Brand
Hasco
Mixing Ratio
10:1
Compressed Air
0.6-0.8MPa
Dimension
1750×950×1980mm
Type
Insulating Glass Production Line
Structure
Vertical
Condition
New
After-Sales Service
One Year Guarantee, All Life Long After Service
Control System
Pneumatic Switch
Transport Package
Seaworthy Package
Trademark
DETEK
Origin
China
HS Code
8464901900
Production Capacity
500sets/Year

Product Description

Two Component Insulating Glass Secondary Sealant Spreading Machine
Application


Model ST02 sealant spreading machine is made with the latest domestic and international technologies, which applies to the sealing and spreading of secondary sealant. A /B pump adopt S. Korea pneumatic air motor, which works sensibly and reliably. Its unique adjustable proportioning mechanism meets the rigorous requirements for double constituent sealant proportion to maximum extent, with a smooth sealant flow, good coating effect and high production efficiency as well.
Two Component Insulating Glass Secondary Sealant Spreading Machine
Two Component Insulating Glass Secondary Sealant Spreading Machine

Feature
  1. Suitable for mass production of insulating glass and curtain wall
  2. Pneumatic control, easy for operation
  3. A/B air motor adopt American advanced technology, S. Korea brand air motor
  4. Integrated structure of A/B sealant pump, avoid sealant leakage
  5. Special device to avoid A/B sealant pump running idle.
  6. Special one-way value in high pressure pump, sealant output smoothly, suitable for all kinds of sealant, avoid incomplete mixing.
  7. Multi filter system to keep clean of sealant
  8. Stainless steel mixer and unique sealing gun, guarantee the sealant mixing effect
  9. One-way valve is made of high wear-resistant material, long life time
  10. The rotating arm is equipped with universal device, flexible and portable
Parameter
Mixing ratio 6:1-14:1
Sealant output 4-10L/min
Max. dispensing pressure 30Mpa
Air supply 0.8-1.0 Mpa
Air consumption 0.8M3/min
Diameter of A/B drum 570mm/280mm
Dimension 1750×950×1980mm
Weight 510Kg

Brand parts list
Name Brand Country
A/B air motor Hasco/YL S. Korea
Safety valve Hasco S.Korea
Pressure gauage Delta TAIWAN
Sealing gun Self-made China

Two Component Insulating Glass Secondary Sealant Spreading MachineTwo Component Insulating Glass Secondary Sealant Spreading MachineTwo Component Insulating Glass Secondary Sealant Spreading Machine
Two Component Insulating Glass Secondary Sealant Spreading Machine
Two Component Insulating Glass Secondary Sealant Spreading Machine
Two Component Insulating Glass Secondary Sealant Spreading Machine

Two Component Insulating Glass Secondary Sealant Spreading Machine
Mostly asked questions below:

1. What is your soonest lead time?
  A: 60 days for whole production line, 30 days for single machine.  Special requirement pls check with sales.

2. How do you arrange the shipment?
  A: All machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.

3. Guarantee ?
  A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.

4. How we can install the machines?
  A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and            food).
      The installation should be finished within 15 days, and will be charged 60USD/engineer/day.

5. How about the after service?
  A: Spare parts within 72 hours.
      Experienced technical sales sort out most of your questions.
      Tens of service engineers ready for on-site service and instruction.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier