Spacer Lifting Table for Aluminum Spacer Installation During Igu Processing

Product Details
Customization: Available
Certification: CE
Control System: Foot Switch
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
4
Year of Establishment
2016-04-25
  • Spacer Lifting Table for Aluminum Spacer Installation During Igu Processing
  • Spacer Lifting Table for Aluminum Spacer Installation During Igu Processing
  • Spacer Lifting Table for Aluminum Spacer Installation During Igu Processing
  • Spacer Lifting Table for Aluminum Spacer Installation During Igu Processing
  • Spacer Lifting Table for Aluminum Spacer Installation During Igu Processing
  • Spacer Lifting Table for Aluminum Spacer Installation During Igu Processing
Find Similar Products

Basic Info.

Lifting Height
1035mm
Type
Insulating Glass Production Line
Structure
Vertical
Condition
New
Warranty
One Year
After-Sales Service
One Year Guarantee, All Life Long After Service
Transport Package
Seaworthy Package
Trademark
DETEK
Origin
China
HS Code
8464901900
Production Capacity
500sets/Year

Product Description

Spacer Lifting Table for Aluminum Spacer Installation During Igu Processing
Spacer Lifting Table for Aluminum Spacer Installation During Igu Processing

Lifting table with separate hydraulic station as the driven force, foot switch for up and down by operator.


Technical parameter
Power supply 3P 380V 50HZ
Total power 1.5 kw
Platform size 450×4000mm or customized
Max. height of platform 1035mm
Spacer Lifting Table for Aluminum Spacer Installation During Igu Processing
Spacer Lifting Table for Aluminum Spacer Installation During Igu ProcessingSpacer Lifting Table for Aluminum Spacer Installation During Igu ProcessingSpacer Lifting Table for Aluminum Spacer Installation During Igu Processing
Spacer Lifting Table for Aluminum Spacer Installation During Igu Processing
Spacer Lifting Table for Aluminum Spacer Installation During Igu Processing
Spacer Lifting Table for Aluminum Spacer Installation During Igu Processing
Spacer Lifting Table for Aluminum Spacer Installation During Igu Processing

Mostly asked questions below:

1. What is your soonest lead time?
  A: 60 days for whole production line, 30 days for single machine.  Special requirement pls check with sales.

2. How do you arrange the shipment?
  A: all machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.

3. Guarantee ?
  A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.

4. How we can install the machines?
  A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.

5. How about the after service?
  A: Spare parts within 72 hours.
     Experienced technical sales sort out most of your questions.
    Tens of service engineers ready for on-site service and instruction.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier